×

Warning

JUser: :_load: Unable to load user with ID: 592
Saturday, 30 October 2021 09:42

Al Ain Hospital - Al Ain

SCOPE

2D Drafting, MEP, Electrical Drawings

Year

2018

Location

Abu Dhabi, UAE

Owner
Abu Dhabi Health Services Company (SEHA)
Value

USD 1.2 Billion

Al Ain Hospital – Al Ain

Al Ain Hospital consists of 35 specialist departments. It has 402-bed acute care and emergency hospital with more than 300 doctors. 

Project Description

DDDc's CAD Draftsmen are working as part of the drafting team that develops the shop drawings for the MEP services for the project.

 


 

 


Warning: count(): Parameter must be an array or an object that implements Countable in /home/kgmkrljstu99/public_html/templates/octagon/html/com_k2/templates/default/tag.php on line 89
Published in Projects
Saturday, 30 October 2021 09:31

Port Khalifa Etihad Rail - Abu Dhabi

SCOPE

3D Modelling, BIM Coordination, 2D Drawing Extraction, LOD-400, LOD-500, Signages, Landscaping, MEP, Interior, Fitout

Year

2021

Location

Abu Dhabi, UAE

Client

Value

USD 7.2 Billion

BIM Project Description

DDDc was involved in the development of the

Port Khalifa Etihad Rail - Abu Dhabi

This is the first national freight and passenger railway network. It has 1,200km and it is connected with the seven emirates of the UAE. It is expected to serve about 16 million passenger and 50 million tons of freight.

 

 

                                                

 


Warning: count(): Parameter must be an array or an object that implements Countable in /home/kgmkrljstu99/public_html/templates/octagon/html/com_k2/templates/default/tag.php on line 89
Published in Projects
Saturday, 30 October 2021 07:54

EKFC & Crop One Vertical Farming - Dubai

SCOPE

3D Modelling, BIM Coordination, 2D Drawing Extraction, LOD-400, LOD-500

Year

2021

Location

Dubai, UAE

Owner

Emirates Flight Catering (EKFC), Crop One Holdings Inc.

Value

USD 40 Million

EKFC & Crop One Vertical Farming - Dubai

EKFC & Crop One is vertical farming that produces crops indoor using technology. It can be located anywhere because all nutrients needed will be provided in a controlled environment. They use technology rather than chemicals and it is typically growing in a soil-less medium using nutrient solution.

BIM Project Description

BIM Modellers from DDDc were part of the team that developed 3D BIM Models for the Electrical services of the project.

 

 

 


Warning: count(): Parameter must be an array or an object that implements Countable in /home/kgmkrljstu99/public_html/templates/octagon/html/com_k2/templates/default/tag.php on line 89
Published in Projects
Friday, 23 April 2021 12:26

Hilton Family Hotel - Abu Dhabi

SCOPE

3D Modelling, BIM Coordination, 2D Drawing Extraction, LOD-400, LOD-500, Signages, Landscaping, MEP, Interior, Fitout

Year

2020-2021

Location

Yas Bay, Yas Island, Abu Dhabi

Client

San Jose Fibrex JV

Value

USD 350 Million

Hilton Family Hotel - Yas Bay, Abu Dhabi

This upscale hotel is situated along Yas Bay on lively Yas Island. It is 3 km from Ferrari World Abu Dhabi and 6 km from Warner Bros. World™ Abu Dhabi. The development consists of 1 Basement, 12 Floors of hotel space and 2 Floors of Retail with a total GFA of approximately 220,000 sq. m.

BIM Project Description

DDDc was involved in the development of the 3D BIM deliverables for the project through the LOD 500 stage. DDDc was responsible for the BIM deliverables including coordinated 3D BIM models, clash reports, and the 2D drawings required for construction. DDDc provided services as lumpsum packages and through the secondment of skilled resources. The scope of the BIM deliverables included all MEP services, Interior, Fitout, Retail Signages, Canopies, Landscaping, Civil works, Irrigation, and many more.

                                                                                                                                                  

 

                          

 

 


Warning: count(): Parameter must be an array or an object that implements Countable in /home/kgmkrljstu99/public_html/templates/octagon/html/com_k2/templates/default/tag.php on line 89
Published in Projects