2D Drafting, MEP, Electrical Drawings
2018
Abu Dhabi, UAE
USD 1.2 Billion
Al Ain Hospital consists of 35 specialist departments. It has 402-bed acute care and emergency hospital with more than 300 doctors.
DDDc's CAD Draftsmen are working as part of the drafting team that develops the shop drawings for the MEP services for the project.
|
|
3D Modelling, BIM Coordination, 2D Drawing Extraction, LOD-400, LOD-500, Signages, Landscaping, MEP, Interior, Fitout
2021
Abu Dhabi, UAE
USD 7.2 Billion
DDDc was involved in the development of the
This is the first national freight and passenger railway network. It has 1,200km and it is connected with the seven emirates of the UAE. It is expected to serve about 16 million passenger and 50 million tons of freight.
|
|
![]() |
2021
Abdulla Oman Taryan St - Jazeerat Al Reem - Abu Dhabi - United Arab Emirates
Itinera Ghantoot
USD 1.2 Billion
DDDc was involved in the development of the
Reem Mall is the world’s largest indoor snow park. Delivering 2.8 million square feet of retail (2m square feet of leasable space) Reem Mall will comprise around 450 stores, including 85 F&B outlets and a range of family-focused entertainment offerings.
|
|
2019
Lusail, Doha
Redco Almana
USD 900 Million
DDDc was involved in the development of the
Qetaifan Island North is the first entertainment island of its kind in Qatar and a key element of the Lusail expansion project. The project contains leisure attractions, luxurious hotels, unrivaled accommodation, and world-class facilities. All the rides within the waterpark are inspired by the Qatari culture; complementing the theme of the oil and gas industry.
|
|
3D Modelling, BIM Coordination, 2D Drawing Extraction, LOD-400, LOD-500, Signages, Landscaping, MEP, Interior, Fitout
2020-2021
Yas Bay, Yas Island, Abu Dhabi
San Jose Fibrex JV
USD 350 Million
This upscale hotel is situated along Yas Bay on lively Yas Island. It is 3 km from Ferrari World Abu Dhabi and 6 km from Warner Bros. World™ Abu Dhabi. The development consists of 1 Basement, 12 Floors of hotel space and 2 Floors of Retail with a total GFA of approximately 220,000 sq. m.
DDDc was involved in the development of the 3D BIM deliverables for the project through the LOD 500 stage. DDDc was responsible for the BIM deliverables including coordinated 3D BIM models, clash reports, and the 2D drawings required for construction. DDDc provided services as lumpsum packages and through the secondment of skilled resources. The scope of the BIM deliverables included all MEP services, Interior, Fitout, Retail Signages, Canopies, Landscaping, Civil works, Irrigation, and many more.
![]() |
|
BIM 3D Modelling, MEP, Electrical Services, Drawing Extraction
2021
Sheikh Zayed Road, Dubai
BAM Higgs & Hill
USD 136 Million
DDDc's BIM Modellers were part of the BIM team that developed the BIM deliverables for the Electrical services for the project, including 3D Models and drawings extracted from the BIM.
|
|
3D BIM Modelling, Roof and Façade Cladding, LOD 500, BIM Coordination, Fitout
2020
Dubai, United Arab Emirates
Expo 2020
AED 300 Million
Al Wasl hotel features 312 king, twin and accessible Rover Rooms, as well as 19 Rover suites. It will also boast of several dining and social outlets, including The Daily, a grab&go Rove Café and The Bar, along with a rooftop swimming pool and sundeck overlooking Al Wasl Plaza.
DDDc executed a lump-sum fixed-price contract to develop the 3D BIM Models for the Roof and Façade Cladding. The deliverables included BIM Models in *.rvt format and clash report in .*.nwf/*.nwd formats.
The BIM deliverables for the Fitout package for the Al Wasl Hotel were developed by DDDc. The team produced LOD 500 stage BIM 3D models with Facility Management data included.
![]() |
|
3D Modelling, BIM Coordination, 2D Drawing Extraction, LOD-400, LOD-500, MEP
2020
Abu Dhabi
Multiplex
USD 800 Million
Galleria Mall is a super-regional mall in the heart of the city. It has more than 400 stores, including 300 of the world’s most popular brands, 100 dining options, urban parks, and world-class entertainment.
DDDc's BIM coordinator was part of the team that developed the BIM 3D Models for the MEP discipline for the project. The responsibilities included 3D Modelling, Coordination and Drawing extraction.
|
|
3D BIM Modelling, BIM Coordination, Drawing Extraction, MEP, Electrical
2020-2021
Dubai, UAE
USD 600 Million
One Zabeel is consist of two slender towers connected by a 230-meter-long steel bridge. The two towers house residential units, a hotel, and offices.
DDDc's BIM coordinator was part of the MEP BIM team that developed 3D BIM Models, performed BIM Coordination and extracted 2D Drawings from the BIM.
|
|