BIM 3D Modelling, MEP, Electrical Services, Drawing Extraction
2021
Sheikh Zayed Road, Dubai
BAM Higgs & Hill
USD 136 Million
DDDc's BIM Modellers were part of the BIM team that developed the BIM deliverables for the Electrical services for the project, including 3D Models and drawings extracted from the BIM.
|
|
3D BIM Modelling, Roof and Façade Cladding, LOD 500, BIM Coordination, Fitout
2020
Dubai, United Arab Emirates
Expo 2020
AED 300 Million
Al Wasl hotel features 312 king, twin and accessible Rover Rooms, as well as 19 Rover suites. It will also boast of several dining and social outlets, including The Daily, a grab&go Rove Café and The Bar, along with a rooftop swimming pool and sundeck overlooking Al Wasl Plaza.
DDDc executed a lump-sum fixed-price contract to develop the 3D BIM Models for the Roof and Façade Cladding. The deliverables included BIM Models in *.rvt format and clash report in .*.nwf/*.nwd formats.
The BIM deliverables for the Fitout package for the Al Wasl Hotel were developed by DDDc. The team produced LOD 500 stage BIM 3D models with Facility Management data included.
![]() |
|