×

Waarschuwing

JUser: :_load: Kan gebruiker met ID: 592 niet laden


Notice: Undefined property: stdClass::$description in /home/kgmkrljstu99/public_html/templates/octagon/html/com_k2/templates/default/user.php on line 59
zaterdag, 30 oktober 2021 09:57

Project Scala - Netherlands

SCOPE

Year

2009

Location

Boss en Lommer, Netherlands

Client

Giesbers Almere

Value

$35 Million

BIM Project Description

DDDc was involved in the

Project Scala - Amsterdam

Kolenkit is one of the poorest neighborhood of Amsterdam it consist 2000 small poor quality flat. The project scala is a program in the city of kolenkit. Improving living qualities and making connections with pre-war Amsterdam, that's what they wanted. A very diverse program has been realized at a compact location of 230 × 30 meters, including various care homes. The plan has been carefully incorporated, taking into account sound from both sides, and beautifully materialized with quality materials that we know will last.

                                                                                                                                                

 

                          

 

 

zaterdag, 30 oktober 2021 09:53

Al Wasl Plaza Expo 2020 - Dubai

SCOPE

3D Modelling, BIM Coordination, LOD-400, LOD-500, Audio Visual, Speakers, Projectors

Year

2021

Location

Dubai, United Arab Emirates

Owner

Expo 2020

Value

USD 300 Million

Al Wasl Plaza

Al Wasl Plaza is the world's largest 360-degree projection dome built for Dubai Expo 2020. The plaza connects the three Thematic Districts (Sustainability, Mobility and Opportunity) and provides access the UAE Pavilion, Metro Station and concourses.

Al Wasl plaza has a 150-meter diameter and it will be topped by a 65-meter-high domed trellis. It is constructed entirely of steel, around 13.6 kilometers of it. Al Wasl plaza also consists of 252 laser projectors working to splash images onto the surface of the Al Wasl dome. This image is actually viewed not just inside the dome but also outside. It is being designed as a central hub of the explosion.

BIM PROJECT DESCRIPTION

DDDc developed the BIM 3D models for the projectors and the speakers placed in the plaza. The 3D models with the updated ABS data were developed in Revit from the provided drawings.

                                     

 

 

 

zaterdag, 30 oktober 2021 09:42

Al Ain Hospital - Al Ain

SCOPE

2D Drafting, MEP, Electrical Drawings

Year

2018

Location

Abu Dhabi, UAE

Owner
Abu Dhabi Health Services Company (SEHA)
Value

USD 1.2 Billion

Al Ain Hospital – Al Ain

Al Ain Hospital consists of 35 specialist departments. It has 402-bed acute care and emergency hospital with more than 300 doctors. 

Project Description

DDDc's CAD Draftsmen are working as part of the drafting team that develops the shop drawings for the MEP services for the project.

 


 

 

zaterdag, 30 oktober 2021 09:31

Port Khalifa Etihad Rail - Abu Dhabi

SCOPE

3D Modelling, BIM Coordination, 2D Drawing Extraction, LOD-400, LOD-500, Signages, Landscaping, MEP, Interior, Fitout

Year

2021

Location

Abu Dhabi, UAE

Client

Value

USD 7.2 Billion

BIM Project Description

DDDc was involved in the development of the

Port Khalifa Etihad Rail - Abu Dhabi

This is the first national freight and passenger railway network. It has 1,200km and it is connected with the seven emirates of the UAE. It is expected to serve about 16 million passenger and 50 million tons of freight.

 

 

                                                

 

zaterdag, 30 oktober 2021 07:54

EKFC & Crop One Vertical Farming - Dubai

SCOPE

3D Modelling, BIM Coordination, 2D Drawing Extraction, LOD-400, LOD-500

Year

2021

Location

Dubai, UAE

Owner

Emirates Flight Catering (EKFC), Crop One Holdings Inc.

Value

USD 40 Million

EKFC & Crop One Vertical Farming - Dubai

EKFC & Crop One is vertical farming that produces crops indoor using technology. It can be located anywhere because all nutrients needed will be provided in a controlled environment. They use technology rather than chemicals and it is typically growing in a soil-less medium using nutrient solution.

BIM Project Description

BIM Modellers from DDDc were part of the team that developed 3D BIM Models for the Electrical services of the project.

 

 

 

vrijdag, 23 april 2021 12:26

Qetaifan Water Park - Qatar

SCOPE

 

Year

2019

Location

Lusail, Doha

Client

Redco Almana

Value

USD 900 Million

BIM Project Description

DDDc was involved in the development of the 

Qetaifan Water Park

Qetaifan Island North is the first entertainment island of its kind in Qatar and a key element of the Lusail expansion project. The project contains leisure attractions, luxurious hotels, unrivaled accommodation, and world-class facilities. All the rides within the waterpark are inspired by the Qatari culture; complementing the theme of the oil and gas industry.

 

 

                                                                                           

 

 

vrijdag, 23 april 2021 12:22

New NATO Military HQ - Belgium

SCOPE

BIM 3D Modelling, MEP, Electrical Services, Drawing Extraction 

Year

2021

Location

Sheikh Zayed Road, Dubai

Client

BAM Higgs & Hill

Value

USD 136 Million

Museum of the future - Dubai

The Museum of the Future combines elements of exhibition, immersive theatre, and themed attraction. It provides an enthralling experience of the future that you can inhabit, explore and interact with. Crafted by a team of the world’s leading product, media, exhibition, and experience designers, the exhibits cover topics like space travel and living, climate change and ecology, health, wellness, and spirituality.

BIM Project Description

DDDc's BIM Modellers were part of the BIM team that developed the BIM deliverables for the Electrical services for the project, including 3D Models and drawings extracted from the BIM.

 

 

 

 

vrijdag, 23 april 2021 12:22

Al Wasl Hotel - Expo 2020 - Dubai

SCOPE

3D BIM Modelling, Roof and Façade Cladding, LOD 500, BIM Coordination, Fitout

Year

2020

Location

Dubai, United Arab Emirates

Owner

Expo 2020

Value

AED 300 Million

Al Wasl Hotel - Expo 2020 - Dubai

Al Wasl hotel features 312 king, twin and accessible Rover Rooms, as well as 19 Rover suites. It will also boast of several dining and social outlets, including The Daily, a grab&go Rove Café and The Bar, along with a rooftop swimming pool and sundeck overlooking Al Wasl Plaza.

BIM Project Description

DDDc executed a lump-sum fixed-price contract to develop the 3D BIM Models for the Roof and Façade Cladding. The deliverables included BIM Models in *.rvt format and clash report in .*.nwf/*.nwd formats.

The BIM deliverables for the Fitout package for the Al Wasl Hotel were developed by DDDc. The team produced LOD 500 stage BIM 3D models with Facility Management data included.

                                                                                                         

 

                          

 

 

vrijdag, 23 april 2021 12:22

Galleria Mall - Abu Dhabi

SCOPE

3D Modelling, BIM Coordination, 2D Drawing Extraction, LOD-400, LOD-500, MEP

Year

2020

Location

Abu Dhabi

Client

Multiplex

Value

USD 800 Million

Galleria Mall – Abu Dhabi

Galleria Mall is a super-regional mall in the heart of the city. It has more than 400 stores, including 300 of the world’s most popular brands, 100 dining options, urban parks, and world-class entertainment.

BIM Project Description

DDDc's BIM coordinator was part of the team that developed the BIM 3D Models for the MEP discipline for the project. The responsibilities included 3D Modelling, Coordination and Drawing extraction.

 

 

 

 

vrijdag, 23 april 2021 12:22

One Zabeel Towers - Dubai

SCOPE

 3D BIM Modelling, BIM Coordination, Drawing Extraction, MEP, Electrical

Year

2020-2021

Location

Dubai, UAE

Owner

Ithra Dubai LLC
Value

USD 600 Million

One Zabeel Tower – Dubai

One Zabeel is consist of two slender towers connected by a 230-meter-long steel bridge. The two towers house residential units, a hotel, and offices.

BIM Project Description

DDDc's BIM coordinator was part of the MEP BIM team that developed 3D BIM Models, performed BIM Coordination and extracted 2D Drawings from the BIM.

 

 

                          

 

 


Warning: count(): Parameter must be an array or an object that implements Countable in /home/kgmkrljstu99/public_html/templates/octagon/html/com_k2/templates/default/user.php on line 260
Pagina 1 van 2